Customer – JSC “Chelyabinsk Forge-and-Press Plant”.
Development of design and working documentation and execution of works on application of superfine thermal insulating coating on the process equipment and heat pipes.
According to a report determining the effectiveness of the applied thermal insulation TEMP-COAT as a result of work the temperature of the equipment surface dropped to 43 °C (up to a safe value) and natural gas consumption reduced by 362.73 cubic meters per day or 130,582.8 cubic meters per year.